Crane arm installation

NOTE: The Crane Arm is optional on VF 6-11 machines.

Important: Crane Arm is secured to the pallet, under the machine. Do not discard the pallet or packing material until the crane arm has been removed.

Installation Procedure

1. Remove the Crane Arm from the shipping base.

2. Lift the Crane Arm into position. There is a hole in the Crane Arm specifically for lifting.

3. Secure the Crane Arm to the right side of the column using the four (4) bolts and washers provided. Make sure all of the cables are guided through the opening on the crane between the mounting bolts. Do not allow them to become pinched between the Crane Arm and the column when mounting.